iPower Electrical & Heating
Home / Services / New Builds & Renovations

Electrical design, rough-in and fit-off for new builds

We work alongside your builder from slab to handover - pre-wire planning, neat rough-in, and a tidy fit-off that won't hold up your final inspection.

What's included

Everything we cover under new builds & renovations

If you don't see what you need below, give us a call - there's a good chance we still do it.

Where new builds slip

The cheapest fix is the one you sort before the gyprock goes up

On a new build, the fix you never have to make is the cheapest. Three things we nail at rough-in so they don't bite at handover.

Rough-in walkthrough with you on site

Last chance to add a power point, move a switch or pull an extra data run while it's still free to do. We don't skip this, even if the builder pushes.

Switchboard sized for the next decade

Spare ways for solar, EV, heating zones and the renos you haven't planned yet. Boards we install today won't be the bottleneck in 2032.

Trades that actually talk to each other

We coordinate directly with the chippy, plumber and gas fitter - cut-outs, chases and conduit runs that work first time, not after three redos.

Starting a build?

Get us in before the gyprock goes up

The earlier we walk the plans with you (or your builder), the cheaper your wiring gets. Drop a few details and we'll book a site visit.

Or call 0438 961 005
Photos from the field

Recent new builds & renovations

A handful of recent builds - hover for the brief and what we delivered.

Slab-to-handover, Legana

Full electrical on a 4-bedroom new build. Pre-wired for solar, EV charger and zoned heat-pump heating. Finished a week ahead of programme.

Rough-in, double-storey new build

Power, data, lighting and ducted heat-pump rough-in coordinated alongside the chippy and plumber. Cut-outs and chases nailed first time.

Heritage cottage extension

Rewired existing fabric plus a new rear extension - routed through cavities and skirting voids, no patching to existing walls.

FAQ

Questions we get asked

Anything we haven't covered? Call 0438 961 005 and we'll talk it through.

Do I book you, or does my builder?+
Either works. Some builders prefer to manage trades; others happily hand it to the owner.
Can you read my architect's plans?+
Yes - send through PDFs and we'll mark up our scope on top.
Will you supply fittings or do I buy them?+
Both options work - we have trade pricing on most major brands.
How long is rough-in?+
A standard 3-bed home is usually 2–3 days for rough-in, 2 days for fit-off.
Where we work

Servicing Launceston & surrounds

From the CBD out to Hadspen, Perth, Longford, Legana and Bridgenorth - we cover 25 km around central Launceston, and travel further for the right job.

Get started

Need an electrician in Launceston?

Most quotes are back the same business day. For something urgent - a fault, an outage, no heat - the phones are answered 24/7.

Call us direct 0438 961 005
Open now · Mon–Fri 7am–5pm · 24/7 emergencies
Prefer in writing? Request a Quote